renovation after week 1..

aircon piping was laid so its a good time to do inspection. didn't supervise the laying as need to work. now can only trust that the workers do a good job..


piping and wiring at aircon ledge


piping going thru the master toilet and out of the window.. need to drill the big hole thru and patch back..


master bedroom..


bedroom 2..


bedroom 3..


the 38th storey view =))